Mission Bay Utilities & Distribution – Phase 2

Project Details

This project was actually two adjacent projects awarded as one, as described below:

M5439F- All construction services required for the replacement of the damaged direct bury, high temperature, hot water, steam and chilled water utility piping distribution systems passing through mechanical manholes extending from UCSF Mission Bays Rock Hall Building to the Helen Diller Building. Construction of major manhole modifications or replacements including mechanical equipment installations, electrical power, communications and control work, Joint Trench. Replace paving, curbs, gutter and sidewalk areas, and walkways demolished for installation of new piping distribution system.

M 8448- All construction services required for the construction of underground civil and mechanical piping, new roadways, curbs, gutters, sidewalks and surface improvements including sidewalks, street lighting, street trees and irrigation. Site location was on Nelson Rising Lane from Fourth St to 30 feet west of Fifth St and Fifth St from Gene Friend Way to Mission Blvd, and running utilities on to Building 19A, site bounded on the north by Nelson Rising Lane, on the east by Existing Building 19B, on the south by Gene Friend Way, and on the west 5111 St.

Project Info

Status: Past

Client Type:

OWNER

UCSF Capital Programs & Facilities Management

 

ENGINEER

UCSF Capital Programs & Facilities Management

 

CONSTRUCTION MANAGER

UCSF Capital Programs & Facilities Management

 

CONTRACT VALUE

$19,315,400