This project involves the removal of existing gravity sewer and replacement with 18” HDPE by open cut method. Pipebursting existing 15-inch sewer with 20-inch HDPE, rehabilitating a 15” sewer with the CIPP (cured in place pipe) method and the installation of sanitary sewer manholes and cleanouts.
Status: Current
Category: Sewer Transmission,
Client Type: City,