Furnished and installed approximately 4 miles of 42″ and 36″ diameter welded steel pipe from Holloway Avenue and Junipero Serra Blvd to Dartmouth and Felton St. Installation of butterfly valves, air valves, blow-offs and bypasses. Relocation of an existing water main in Edna St, jacking and boring at two street intersections, installing corrosion protection and all related site work and traffic monitoring and control. Deep shoring.
Status: Past
Category: Water Transmission,
Client Type: City, San Francisco,