Project features upsizing 4,150LF of existing 18″ sewer line to a 27″ sewer line. 5,700LF of new 30″ sewer main will be installed, of which 580LF of the proposed 30-inch sewer line in the Gateway Park will be installed using Pilot Tube Guided Boring. This project will also replace the existing 10″ VCP sewer line with a 10″ PVC pipe for approximately 2,300LF along El Cerrito Avenue and Tilton Avenue, between the City limit and North Railroad Avenue.
Status: Past
Category: Water Transmission,
Client Type: City, San Mateo,