This project consisted of the construction of sewer pipe along Fruitridge Blvd from approx 44th Street to approx South Watt Ave, Stockton Boulevard from approx 20th Ave to approx Fruitridge Blvd, and 20th Ave from Stockton Blvd to 55th Street, 55th Street from 20th Ave to 21st Ave and 21st Ave from 55th Street to approximately 73rd Street in Sacramento, CA.
Work also involved installing the following individual quantities: 1 Vortex Drop Manhole; modification of Central Interceptor Junction Structure; 1826 LF of 4″ service connection pipe; 160LF of 6″ gravity sewer pipe; 3800 LF of 8″ pipe; 890 lf of 10″ pipe; 3190LF of 12″ pipe; 1880 LF of 15″ pipe; 4230 lf of 18″ pipe; 4165 lf of 21″ pipe; 8934 lf of 24″ pipe; 650 lf of 42″ pipe; 20 lf of 48″ pipe; 4260 lf of 54″ pipe; 16,000 LF of 30” SDR 11 HDPE Pipe by open cut construction; 6440 lf of 36″” HDPE force main pipe; 300 lf of 36″ casing pipe; 150 lf of 42″ casing pipe; 150 lf of 60″ casing pipe; 220 lf of 8″ slipliner pipe; 66 lf of 6″ PVC air vent.
Overall accumulated quantities: 69 each 4″ cleanouts; 16290 lf of sewer pipeline in place; 181 standard manholes; dual combination air valve assembly and force main manhole; 5 interceptor manholes; 4200 lf of water main; 17 water system gate valves; 42 domestic water service connections; and connections to city water mains.
Status: Past
Category: Sewer Transmission,
Client Type: County, County of Sacramento,