Genentech Upper And Mid Campus

Owner:

Genentech, Inc.

Engineer:

Affiliated Engineers, Inc and BKF

Construction Manager:

DPR Construction

Contract Value:

$2,941,170

Project Description:

This project included the installation of 1,100LF of joint trench with 2 each 14″ insulated chilled hydronic water lines and 1 each 4″ recycled CPVC water line.

Project Information:

Status: Past
Category: Hydronic Systems, Water Transmission,
Client Type: Genentech, Private/CG,