Project Description:

This project’s main objective was to build a new waste transfer station, maintenance bay, and offices for the existing maintenance vehicles to dispose of their liquid contents at the end of the shift.
In order to facilitate that objective, it was necessary to begin with site preparation tasks such as rough grading, fine grading, asphalt concrete paving, concrete paving, curb installation, landscaping, pavement painting, signage, lighting, fencing, among other tasks. This included excavations for the waste decanting station, utility trenches, bio-retention basins, various foundations, Sewer Operations training facility, fencing, and other tasks. Excavations required dewatering at roughly elevation 0. Utility installations were required for electrical power, sewer, potable water, storm drains, communications, and security systems.
Also included were relocation, assembly, and modification of existing portable trailers including preparation of the existing plumbing (sewer and water) for habitable use, commissioning existing HVAC system, installation of communications and audio/visual equipment, security system, electrical power, a prefabricated structure to serve as a new vehicle maintenance building, and building exterior deck.

Project Information:

Status: Current
Category: Other, Sewer Transmission,
Client Type: City, San Francisco,