Fremont Union High School needed to replace their entire central infrastructure. This required some intricate timing hurdles to work while students were not on campus.
The project included tying together classroom heating and cooling systems in various classroom buildings and conveyance to the central boiler room. It included some rerouting of buried and above ground fire systems, domestic water, hydronics, and also included dry utilities for switching, electrical and other systems.
Status: Past
Category: Design/Build, Dry Utilities, Hydronic Systems, Water Transmission,
Client Type: Kitchell, Private/CG,