Mission Bay Block 23A Site Utility Loop and Connections

Owner:

The Regents of the University of California

Engineer:

Jacobs Engineering Group Inc.

Construction Manager:

The Regents of the University of California

Contract Value:

$9,807,910

Project Description:

Project includes the construction of the site utility loop extensions from the existing utility loop termination connections outside of UCSF’s Rock Hall Building to the new connections outside the new Block 23A Neurosciences Research Building to support the new building utility demand. Scope of work is for the installation of civil utilities to within 5’ of the Block 23A building. Work will include but not limited it to, the demolition of existing landscaping and site work, excavation and trenching. Scope of work also includes but not limited to the installation of Manhole Vaults, Chilled Water, Steam, Sanitary Sewer, Storm Drain, Fire Water, Domestic Water, Electrical Ductbanks, Telecom Ductbanks and Generator relocation. Final phase of work will be backfilling trench, finish grade and install new site work, asphalt paving and landscaping.

Project Information:

Status: Current
Category: Dry Utilities, Hydronic Systems, Sewer Transmission, Water Transmission,
Client Type: Private/CG, UC Regents,