Work consisted of seismic hazard mitigation for the Owner’s Santa Rosa Aqueduct at the Rodgers Creek fault crossing, within the limits of the City of Santa Rosa, California, on Sonoma Avenue between intersections of Sotoyome Street and Doctors Park Drive. The Work included the installation of approximately 1,900 linear feet of 36-inch steel water pipe including related fittings and appurtenances, a new water meter turnout, a manifold system to allow for bypass flows, cathodic protection system, electrical service panel, conduits, and cables, and abandonment of existing meter vault and a portion of the existing aqueduct. 1,816 LF-36″ Steel Pipe
Status: Past
Category: Water Transmission,
Client Type: Municipalities, Sonoma County Water Agency,