SJSU Campus Village – Phase 2

San Jose State University Campus, CA

Owner:

SJSU

Engineer:

Salas O'Brien

Construction Manager:

Sundt Construction

Contract Value:

$2,467,777

Project Description:

South East Quadrant of SJSU: Sawcut and remove paving, concrete, base, soil, etc. necessary to demolish and remove existing wet and dry utilities. Locate, excavate, and shore for demolition of existing utility lines, to make room for new rerouting of all utilities surrounding the new campus building. New systems including: chilled and steam water systems with pre-insulated pipelines, new manholes/vaults, sump pump system in manholes, Reclaimed water lines, Domestic Water, Irrigation Water, Storm Drain Lines, Water Well Attachments and Auxiliaries, electrical and telecommunication duct banks and structures.

Project Information:

Status: Past
Category: Dry Utilities, Hydronic Systems, Water Transmission,
Client Type: Private/CG, Sundt,