This project was located at UCB Wheeler campus. Replacement was required for steam lines in a single trench. Configurations were 2 – 10″ and 1 – 6″ or 1 – 8″ direct buried pre-insulated steam pipes, modifications to valves and structures, light pole relocation, curb work
Status: Past
Category: Hydronic Systems,
Client Type: Berkeley, City,