Homestead High School Boiler Room Modifications & Boiler Replacement

Fremont Union High School needed to replace their entire central infrastructure. This required some intricate timing hurdles to work while students were not on campus.
This project included the demolition and removal of the existing boilers that had severely aged and were leading to the failure of the pipeline infrastructure. After removal, Ranger installed replacement skid-type boilers in the central boiler room along with temporary capturing devices for any sediment that was circulating within the aging infrastructure. Pre-Construction services, project management, general conditions, boiler replacements

Homestead High School Utility Infrastructure

Fremont Union High School needed to replace their entire central infrastructure. This required some intricate timing hurdles to work while students were not on campus.
The project included tying together classroom heating and cooling systems in various classroom buildings and conveyance to the central boiler room. It included some rerouting of buried and above ground fire systems, domestic water, hydronics, and also included dry utilities for switching, electrical and other systems.

Genentech B05 to B07 Piping

This Design / Build project was for additional process piping at Genentech South San Francisco campus between Buildings 5 and 7. It included installation of above ground and pre-insulated underground 10″ refrigerated water pipe, 4” Glycol transmission pipes, 3” Stainless steel compressed air line, 1.5” communication conduit, pipe support systems, installation of a controls system, and demolition of existing chillers.