Project Details
This project consisted of the renovation and new construction of fire and domestic water systems, sanitary and storm drain systems, construction of a joint trench electrical and telecommunications duct bank system at the Clark Kerr Campus at the University of California, Berkeley. The work involved the installation of approximately 4,050 LF of 4” to 16” C900, HDPE, and DIP Pipe, construction of 4,080LF of 4”, 6”, and 8” SDR26 and HDPE, and large precast utility vaults.
Project Info
Status: Past
Client Type:
OWNER
Zone 7 Water Agency
ENGINEER
CSW/Stuber Stroeh Engineers
CONSTRUCTION MANAGER
University of California Berkeley
CONTRACT VALUE
$8,143,139