Project Details

This project consisted of the renovation and new construction of fire and domestic water systems, sanitary and storm drain systems, construction of a joint trench electrical and telecommunications duct bank system at the Clark Kerr Campus at the University of California, Berkeley. The work involved the installation of approximately 4,050 LF of 4” to 16” C900, HDPE, and DIP Pipe, construction of 4,080LF of 4”, 6”, and 8” SDR26 and HDPE, and large precast utility vaults.

Project Info

Status: Past

Client Type:

OWNER

Zone 7 Water Agency

 

ENGINEER

CSW/Stuber Stroeh Engineers

 

CONSTRUCTION MANAGER

University of California Berkeley

 

CONTRACT VALUE

$8,143,139