• Who We Are
  • Active Clients
  • Projects
  • Employment
  • Contact Us
  • Awards

Status

Category

Client Type

Client Name

2013 Street & Sewer Rehabilitation

22 Fillmore Transit Priority Project

60-Inch Brick Interceptor Replacement – Phase 1B

Altamont Pipeline – Livermore Reach

Alternative Intake – Victoria Canal Conveyance Pipeline

Bay Division Pipeline No. 5 – East Bay Reaches

Bay Division Pipelines No. 3&4 – Crossover Isolation Valves at Hayward Fault

Belle Haven Sewer Project – Phase II

Bird Avenue Sanitary Sewer & Storm Drain

Bradshaw Interceptor – Section No. 7B

Citywide Sewer & Water Rehabilitation

Clark Kerr Campus Utilities Upgrade

Crystal Springs Pipelines No. 2 – Replacement

Cyclic Sewer Replacement – Phase 10

Dale Avenue Pump Station Wet Well Rehabilitation

Dingee Pipeline and Claremont Centre Aqueducts Replacement

Downtown Sewer & Streetscape Improvements – Phase 1

Downtown Utility Undergrounding

East Campus Utility Improvement

East-West Transmission Main

El Cerrito Relief Line

Electric Street Tank & Pipeline

Folsom South Canal – Jack Tone Rd to Mokelumne River

Freedom T1 Phase 1 – Site Utility Chilled Water Loop

Fruitridge Road Sewer Pipeline Rehabilitation

FY 2014 Gravity Sewer Rehabilitation – Group A

FY 2016/17 Gravity Sewer Rehabilitation

Gas Main Replacement – No. 16

Genentech B05 to B07 Piping

Genentech Upper And Mid Campus

Griffith & Gilman Ave Combined Sewer

Griffith Yard Improvements

Homestead High School Boiler Room Modifications & Boiler Replacement

Homestead High School Utility Infrastructure

Hunters Point Shipyard Redevelopment

Isolation Valves Seismic Hazard Mitigation

Large Diameter Gravity Sewer Rehabilitation – No. II-1

Lincoln Centre Biotech Campus

Marin Street Sewer Replacement

Mission Bay Block 23A Site Utility Loop and Connections

Mission Bay Utilities & Distribution – Phase 1

Mission Bay Utilities & Distribution – Phase 2

NCPA Geothermal General Secondary Containment

North Valley Regional Recycled Water Program Turlock Component

Ophir Road Pipelines

Pacifica Calema 500 Esplanade Storm Drain Outfall

Park Avenue Sewer Replacement

Pavement Renovation, Sewer Replacement, and Water Main Installation ‐ Silver Avenue

Peninsula Pipelines Seismic Upgrade

Penitencia Delivery Main & Force Main Retrofit

Recycled Water Infrastructure Expansion – Phase 1A

Recycled Water North Service Area Segment 2

Regional Groundwater Storage

San Antonio Backup Pipeline

Santa Rosa Aqueduct Hazard Mitigation (Rodgers Creek Fault Crossing)

SCADA System – Phase II

SJSU Campus Village – Phase 2

South Orangevale Sewer Improvements

Southern Loop Pipeline

Southgate Neighborhood Storm Drain Improvement & Green Street

Stevens Creek Blvd Sanitary Sewer Improvement

Student Recreation Center Infrastructure Utilities – No. 4

Upgrade Downtown Project

Utility Relocations – Workday Inc

Van Ness Bus Rapid Transit (BRT)

Wastewater Collection Rehabilitation

Water Main Replacement – No. 23 & 24

Water System Transmission

Wheeler Condensate Steam Pipe Replacement

  • Who We Are
  • Active Clients
  • Projects
  • Employment
  • Contact Us

License#417996, Classes: A, B, C-4 and HAZ | Ranger Pipelines Inc. © 2016 All Rights Reserved
Construction Websites by Thomas Digital