Menu
Who We Are
Active Clients
Projects
Employment
Contact Us
Awards
Status
Current
Past
Category
Design/Build
Dry Utilities
Hydronic Systems
Other
Sewer Transmission
Structural Concrete
Wastewater Treatment
Water Transmission
Water Treatment Plant
Client Type
City
County
Municipalities
Private/CG
Client Name
Alameda
Berkeley
Concord
Mill Valley
Palo Alto
Pittsburg
San Francisco
San Jose
San Mateo
Turlock
Yuba
County of Sacramento
Placer County
Amador Water Agency
Contra Costa Water District
East Bay Municipal District
North Marin Water District
Ross Valley Sanitation District
San Francisco Municial Transportation Agency
Santa Clara Valley Water District
Santa Cruz County Sanitation District
Sonoma County Water Agency
West Bay Sanitary District
Zone 7 Water Agency
DPR Construction
Genentech
Kitchell
Lennar Corporation
NCPA
San Jose State University
Sundt
Turner Construction
UC Berkeley
UC Regents
UCSF
Webcor Builders
2013 Street & Sewer Rehabilitation
22 Fillmore Transit Priority Project
60-Inch Brick Interceptor Replacement – Phase 1B
Airport-Larkfield-Wikiup Sanitation Zone Larkfield Estates Collection System
Altamont Pipeline – Livermore Reach
Alternative Intake – Victoria Canal Conveyance Pipeline
Avenues 1-3 Sewer & Water Replacement
Bay Division Pipeline No. 5 – East Bay Reaches
Bay Division Pipelines No. 3&4 – Crossover Isolation Valves at Hayward Fault
Belle Haven Sewer Project – Phase II
Bird Avenue Sanitary Sewer & Storm Drain
Bradshaw Interceptor – Section No. 7B
Citywide Non-Potable Water Distribution System
Citywide Sewer & Water Rehabilitation
Clark Kerr Campus Utilities Upgrade
College Hill Reservoir Outlet Structure and Pipeline
Crystal Springs Pipelines No. 2 – Replacement
Cyclic Sewer Phase 14
Cyclic Sewer Replacement – Phase 10
Dale Avenue Pump Station Wet Well Rehabilitation
Dingee Pipeline and Claremont Centre Aqueducts Replacement
Downtown Sewer & Streetscape Improvements – Phase 1
Downtown Utility Undergrounding
Earhart Road Sanitary Sewer Improvements
East Campus Utility Improvement
East-West Transmission Main
El Cerrito Relief Line
Electric Street Tank & Pipeline
Folsom South Canal – Jack Tone Rd to Mokelumne River
Freedom Sewer Rehabilitation Project Phase 1
Freedom T1 Phase 1 – Site Utility Chilled Water Loop
Fruitridge Road Sewer Pipeline Rehabilitation
FY 2014 Gravity Sewer Rehabilitation – Group A
FY 2016/17 Gravity Sewer Rehabilitation
Gas Main Replacement – No. 16
Genentech B05 to B07 Piping
Genentech Upper And Mid Campus
Griffith & Gilman Ave Combined Sewer
Griffith Yard Improvements
Hawthorne Utility Undergrounding
Homestead High School Boiler Room Modifications & Boiler Replacement
Homestead High School Utility Infrastructure
Hunters Point Shipyard Redevelopment
Isolation Valves Seismic Hazard Mitigation
Large Diameter Gravity Sewer Rehabilitation – No. II-1
Lincoln Centre Biotech Campus
Marin Street Sewer Replacement
Mission Bay Block 23A Site Utility Loop and Connections
Mission Bay Utilities & Distribution – Phase 1
Mission Bay Utilities & Distribution – Phase 2
NCPA Geothermal General Secondary Containment
North Valley Regional Recycled Water Program Turlock Component
Nunes Water Treatment Plant Upgrades Project
Oak, 98th and Sequoia Rate Control Stations Rehab;
Old Town Pipeline Improvements Project
Ophir Road Pipelines
Pacifica Calema 500 Esplanade Storm Drain Outfall
Park Avenue Sewer Replacement
Pavement Renovation, Sewer Replacement, and Water Main Installation ‐ Silver Avenue
Peninsula Pipelines Seismic Upgrade
Penitencia Delivery Main & Force Main Retrofit
Recycled Water Infrastructure Expansion – Phase 1A
Recycled Water North Service Area Segment 2
Regional Groundwater Storage
San Antonio Backup Pipeline
Santa Rosa Aqueduct Hazard Mitigation (Rodgers Creek Fault Crossing)
SCADA System – Phase II
Sewer Collection System Master Plan 3, 4, 5, & 8
SJSU Campus Village – Phase 2
South Orangevale Sewer Improvements
South Orinda Sewer Renovations Phase 8
Southern Loop Pipeline
Southgate Neighborhood Storm Drain Improvement & Green Street
Stevens Creek Blvd Sanitary Sewer Improvement
Student Recreation Center Infrastructure Utilities – No. 4
Upgrade Downtown Project
Utility Relocations – Workday Inc
Van Ness Bus Rapid Transit (BRT)
Wastewater Collection Rehabilitation
Water Main Replacement – No. 23 & 24
Water Pollution Control Plant: Site Preparation Project
Water System Transmission
Wheeler Condensate Steam Pipe Replacement
Wildcat Pipeline Improvement Berkley