• Who We Are
  • Active Clients
  • Projects
  • Employment
  • Contact Us
  • Awards

Status

Category

Client Type

Client Name

2013 Street & Sewer Rehabilitation

22 Fillmore Transit Priority Project

60-Inch Brick Interceptor Replacement – Phase 1B

Airport-Larkfield-Wikiup Sanitation Zone Larkfield Estates Collection System

Altamont Pipeline – Livermore Reach

Alternative Intake – Victoria Canal Conveyance Pipeline

Avenues 1-3 Sewer & Water Replacement

Bay Division Pipeline No. 5 – East Bay Reaches

Bay Division Pipelines No. 3&4 – Crossover Isolation Valves at Hayward Fault

Belle Haven Sewer Project – Phase II

Bird Avenue Sanitary Sewer & Storm Drain

Bradshaw Interceptor – Section No. 7B

Citywide Non-Potable Water Distribution System

Citywide Sewer & Water Rehabilitation

Clark Kerr Campus Utilities Upgrade

College Hill Reservoir Outlet Structure and Pipeline

Crystal Springs Pipelines No. 2 – Replacement

Cyclic Sewer Phase 14

Cyclic Sewer Replacement – Phase 10

Dale Avenue Pump Station Wet Well Rehabilitation

Dingee Pipeline and Claremont Centre Aqueducts Replacement

Downtown Sewer & Streetscape Improvements – Phase 1

Downtown Utility Undergrounding

Earhart Road Sanitary Sewer Improvements

East Campus Utility Improvement

East-West Transmission Main

El Cerrito Relief Line

Electric Street Tank & Pipeline

Folsom South Canal – Jack Tone Rd to Mokelumne River

Freedom Sewer Rehabilitation Project Phase 1

Freedom T1 Phase 1 – Site Utility Chilled Water Loop

Fruitridge Road Sewer Pipeline Rehabilitation

FY 2014 Gravity Sewer Rehabilitation – Group A

FY 2016/17 Gravity Sewer Rehabilitation

Gas Main Replacement – No. 16

Genentech B05 to B07 Piping

Genentech Upper And Mid Campus

Griffith & Gilman Ave Combined Sewer

Griffith Yard Improvements

Hawthorne Utility Undergrounding

Homestead High School Boiler Room Modifications & Boiler Replacement

Homestead High School Utility Infrastructure

Hunters Point Shipyard Redevelopment

Isolation Valves Seismic Hazard Mitigation

Large Diameter Gravity Sewer Rehabilitation – No. II-1

Lincoln Centre Biotech Campus

Marin Street Sewer Replacement

Mission Bay Block 23A Site Utility Loop and Connections

Mission Bay Utilities & Distribution – Phase 1

Mission Bay Utilities & Distribution – Phase 2

NCPA Geothermal General Secondary Containment

North Valley Regional Recycled Water Program Turlock Component

Nunes Water Treatment Plant Upgrades Project

Oak, 98th and Sequoia Rate Control Stations Rehab;

Old Town Pipeline Improvements Project

Ophir Road Pipelines

Pacifica Calema 500 Esplanade Storm Drain Outfall

Park Avenue Sewer Replacement

Pavement Renovation, Sewer Replacement, and Water Main Installation ‐ Silver Avenue

Peninsula Pipelines Seismic Upgrade

Penitencia Delivery Main & Force Main Retrofit

Recycled Water Infrastructure Expansion – Phase 1A

Recycled Water North Service Area Segment 2

Regional Groundwater Storage

San Antonio Backup Pipeline

Santa Rosa Aqueduct Hazard Mitigation (Rodgers Creek Fault Crossing)

SCADA System – Phase II

Sewer Collection System Master Plan 3, 4, 5, & 8

SJSU Campus Village – Phase 2

South Orangevale Sewer Improvements

South Orinda Sewer Renovations Phase 8

Southern Loop Pipeline

Southgate Neighborhood Storm Drain Improvement & Green Street

Stevens Creek Blvd Sanitary Sewer Improvement

Student Recreation Center Infrastructure Utilities – No. 4

Upgrade Downtown Project

Utility Relocations – Workday Inc

Van Ness Bus Rapid Transit (BRT)

Wastewater Collection Rehabilitation

Water Main Replacement – No. 23 & 24

Water Pollution Control Plant: Site Preparation Project

Water System Transmission

Wheeler Condensate Steam Pipe Replacement

Wildcat Pipeline Improvement Berkley

  • Who We Are
  • Active Clients
  • Projects
  • Employment
  • Contact Us

License#417996, Classes: A, B, C-4 and HAZ | Ranger Pipelines Inc. © 2016 All Rights Reserved
Construction Web Design by Thomas Digital