Project Description:

The Van Ness Bus Rapid Transit Project is a $309,000,000 improvement project which aims to reduce traffic on one of San Francisco’s most heavily used North South arteries with the ultimate aim of cutting MUNI riders travel times by up to thirty two percent.

In a collaborative effort with Walsh Construction, Ranger Pipelines will work to upgrade the area’s underground infrastructure. The work involves replacing the Sewer and Water Main and supporting existing AWSS facilities on the two mile stretch of Van Ness between Mission Street and Lombard Street.

This includes the construction of new 12” to 54” diameter sewer pipe, 6” or 8” side sewer connections, catch basins, manholes and bulkheads for connecting to existing brick sewer. Along with the television inspection of existing and new sewer pipe. Also the Installation of new 4” to 24” diameter water pipe, screw taps and service saddles. Temporary and permanent trench pavement restoration and support work for existing AWSS facilities.

Project Information:

Status: Current
Category: Sewer Transmission, Water Transmission,
Client Type: Private/CG, San Francisco Municial Transportation Agency,