Dingee Pipeline and Claremont Centre Aqueducts Replacement

Project Details

Ranger Pipelines installed approximately 19,000 LF of CML&C Steel pipe ranging in size from 54” to 6” in diameter and approximately 7,750LF of HDPE pipe from 24 inch to 2 inch in diameter. Items included all appurtenances and fittings, providing traffic control measures, providing final pavement restoration, complete preparation for approximately 200 service transfers. Features included installation of two 3,000 gallon surge tanks, installing 3 EA 54” Gate Valves, installing 34 EA 12”-54” main line butterfly valves, installing four magnetic flow meters, installation of electrical wiring and complete final landscaping.

Project Info

Status: Past

Client Type:

OWNER

EBMUD Engineering & Construction Dept.

 

ENGINEER

EBMUD Engineering & Construction Dept.

 

CONSTRUCTION MANAGER

EBMUD Engineering & Construction Dept.

 

CONTRACT VALUE

$27,903,690