Fruitridge Road Sewer Pipeline Rehabilitation

Project Details

This project consisted of the construction of sewer along Fruitridge Blvd in Sacramento, CA.

Work involved installing the following individual quantities: 1 Vortex Drop Manhole; modification of Central Interceptor Junction Structure; 1,826 LF of 4″ service connection pipe; approximately 32,000 LF of gravity sewer pipe ranging in size from 6” to 54” in diameter; 16,000 LF of 30” SDR 11 HDPE Pipe by open cut construction; 6440 LF of 36″” HDPE force main pipe; 300 lf of 36″ casing pipe; 150 lf of 42″ casing pipe; 150 lf of 60″ casing pipe; 220 lf of 8″ slipline pipe; 66 lf of 6″ PVC air vent.

Overall accumulated quantities: 69 ea. 4″ cleanouts; 16,290 LF of sewer pipeline in place; 181 standard manholes; dual combination air valve assembly and force main manhole; 5 interceptor manholes; 4,200 LF of water main; 17 water system gate valves; 42 domestic water service connections; and connections to city water mains.

Project Info

Status: Past

Client Type:

OWNER

County Sanitation District 1 of Sacramento County

 

ENGINEER

Brown & Caldwell

 

CONSTRUCTION MANAGER

County Sanitation District 1 of Sacramento County

 

CONTRACT VALUE

$26,509,819